This case study follows a two-story accessory dwelling unit (ADU) with a rooftop deck in San Diego County. Spacial’s original project account reports four days from design-ready drawings to a stamped set submitted to the city, including design corrections and engineering review.
The project and deadline
The builder was working toward a tight construction schedule, and the architect needed structural markups within 48 hours. With the usual engineer booked out, the team used Spacial’s AI-assisted workflow to move the drawing set through review and revisions.
Four days from drawings to submission
Day 1: Upload and initial review
The architect uploaded the full drawing set as a PDF. The initial review flagged beam sizing, a missing shear wall and lateral-load code inconsistencies for the team to address.
Day 2: Revise the source drawings
The design team reviewed the markups, made the updates in CAD and uploaded the revised set.
Day 3: Engineering review
An engineer reviewed the revised drawings and applied a digital stamp to the final documents.
Day 4: Submit the set
The builder submitted the stamped set through the city’s portal.
The reported result
The team reached a stamped, permit-submittable set in four days. That timeline covers preparation and submission of the project’s drawings.
The workflow brought plan checks, design revisions and engineering review into one sequence before submission. For architects and builders, the practical lesson is in those handoffs: identify issues early, update the source drawings and bring the revised set through engineering review.